Superagento.
All tutorials
Logic · Lesson 21

Delay

Pause briefly between actions

Live example
English narration · 24 sec

Before you run it

For a persistent longer wait, use Wait Until where Release B is enabled.

Read the related guide Open your canvasIncludes a recorded live example using demo data. Configuration close-ups and callouts explain the steps.
English narration generated with Kokoro Heart.

Try it step by step

  1. 1. Delay

    Add a short pause between preparation and the next action.

    THE USE CASEDelay
  2. 2. Place the pause

    Place Delay between the prepared research row and Google Sheets.

    01 / WORKFLOWTransform → Delay → Sheets
  3. 3. Set a small duration

    Set one second for this example. Short Delay is capped at thirty seconds.

    02 / WAIT FOR · UNIT1 · Seconds
  4. 4. Read the measured timing

    The live execution reports a one-second wait, measured at one thousand and forty-nine milliseconds.

    03 / LIVE RESULTWaited 1s · 1049 ms
Read the English transcript

Add a short pause between preparation and the next action.

Place Delay between the prepared research row and Google Sheets.

Set one second for this example. Short Delay is capped at thirty seconds.

The live execution reports a one-second wait, measured at one thousand and forty-nine milliseconds.

Keep learningWait Until